CONSTRUCTION

SES Case Study

CONSTRUCTION

The Problem:

Our Client at a Limestone quarry was looking to improve the guards on various parts of the plant. These guards were in a dilapidated state with mesh damage and steel frame corrosion. They were very heavy when required to be removed and this caused a manual handling problem as well as the safety issues caused by the damage.

SES CS1 Image 2

Our Solution:

New fabricated support posts and guards. Made to suitable sizes that are safely removed. Primed, painted and installed on site.

Improvement achieved:

Nice clean looking guards that are clearly visible. Smaller guards which are lighter to handle. Galvanized mesh and painted steel for anti-corrosion.

 

Benefits achieved:

Productivity – easier viewing of equipment

Maintenance – vastly reduced, lightweight and robust, easier to clean area

CONSTRUCTION

Case Studies

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Call Now ButtonCall SES